Daily maintenance of water-stabilized mixing plant equipment
The reducer (gearbox) and electric drum shall be operated according to the relevant clauses in the instruction manual.
For the bearings of the mixer, aggregate belt conveyor, feeding belt conveyor, and screw conveyor, apply 5-8 strokes of grease to the grease cups with a grease gun before starting the machine each day. Inspect and replace the grease every 200 working hours.

Apply a small amount of grease to the mixer’s transmission gears before starting the machine each day.
Open the covers of each transmission chain once a week and apply a small amount of grease to the chains. Clean the chains every 300 working hours.
Clean the tensioning screws of each belt conveyor and belt feeder once a week and apply new grease.
The working conditions of the mixer are harsh; when the blades are worn to less than 2/3 of their original area, the blades should be replaced.
After each shift, empty the material from the mixing silo and cut off the main power supply; open the upper cover of the mixer and check the tightness of the mixing arms and blades. If any nuts are loose, tighten them immediately to prevent the blades from falling off and causing accidents; clean or remove any material adhering to the equipment to prevent material from sticking and hardening, which could affect the normal operation of the equipment.
If the reducer or electric drum leaks oil, replace the sealing gasket or sealing ring promptly to ensure sufficient oil level.
If the cover plate on the mixer cylinder is damaged, repair it promptly to prevent material from flying out and causing injury.
Maintenance of electrical equipment.